Print

Print


Hi, I'm now using ECJ to do a symbolic regression job. 
    In order to make the result tree easy and nice, I have set the max tree 
depth to 7 instead of default 17. And my way of achiving the utimate formula 
is by using the Graphviz to get a visual tree and then calculating the tree 
manually. 
    Considering that this method is abviously tricky and time-consuming, I'm 
wondering if  there is another way I can go to break and simplify a dreadful 
Lisp expresson.
    Please help me with it, thank you so much !